1 I had to build a removable cover in order to get to the upstairs bathroom plumbing. |
2 I had to replace all the 40mm pipes with 50mm to allow better drainage of the bathtub. |
3 Closing in the floor joists should hopefully keep all the critters out. |
4 It's a somewhat tedious and time consuming job, as none of the deck floor joists are the same dimensions. |
5 Prior to closing this in, rats had got in and chewed the electrical cabling - not a good thing. |
6 This photo's for the Council Inspector, it shows where the cyclone straps are bolted. |